External Walls →

To new extensions

  • Outer leaf: 25mm treated Douglas Fir cladding boards on treated softwood battens & counterbattens
  • 60mm clear cavity
  • Inner Leaf: 140mm thick Insulated timber frame with 9mm OSB sheathing & vapour control sheet
  • 12.5mm vapour-control plasterboard to inside face

To existing building

  • Outer leaf: 450-600mm thick Sandstone to North, East & West elevations
  • Outer leaf: 450-600mm thick clay brick with new acrylic render to South elevation
  • Inner leaf: 60mm insulation-backed plasterboard on steel wall lining studs

Roof Structures →

New-Build Roofs

  • Single-ply TPO roof membrane
  • 100mm expanded foam insulation
  • 19mm plywood roof decking laid to fall
  • New roof joists in TJI engineered timber or plain 220mm treated softwood

Penthouse Balconies

  • Timber decking
  • 120mm expanded foam insulation
  • Reinforced cold-applied modified bitumen roofing system
  • Reinforced concrete floor slabs

Existing Pitched roofs

  • Original roof completely stripped & overhauled
  • Original slates selected, re-dressed & re-hung to outside faces of roof
  • New Spanish slates to inner faces of roof
  • New underlay felt, valley gutters, hip & ridge flashings
  • New rainwater downpipes

Floor Structures →

In Apartment 1

  • 18mm T & G chipboard flooring (water resistant type to bathrooms)
  • Vapour control layer
  • 50mm insulation board
  • In-situ cast floor slab on ‘Holorib’ permanent shuttering

In Apartment 10

  • 18mm T & G chipboard flooring (water resistant type to bathrooms)
  • Vapour control layer
  • 50mm insulation board
  • Proprietary ‘Beam & Block’ concrete flooring system

In Apartments 9, 11 & 19

  • 18mm T&G Chipboard flooring
  • 19mm Gyproc Plank
  • 60mm sound-absorption battens
  • 19mm OSB floor Decking
  • 220mm timber joists
  • 50mm sound insulation quilt
  • 12.5mm plasterboard

In all other Apartments

  • 18mm T&G Chipboard flooring
  • 19mm Gyproc Plank
  • 60mm sound-absorption battens
  • 28mm timber floor planks
  • 250mm timber joists
  • 50mm sound insulation quilt
  • 12.5mm plasterboard

Staircases

  • New steel self-supporting staircase constructed from car park level to serve all floors
  • Stair treads infilled with concrete to reduce impact sound

Internal Walls →

Separating flats from stairs & each other

  • Non-loadbearing staggered-stud drywall construction to overall thickness of 216 mm to achieve required sound & fire resistance

Internal partitions

  • Steel studs with plasterboard to each face
  • Sound insulation quilt packed between studs around bathrooms & en-suites

Windows →

  • All Windows and French doors are new double-glazed quality redwood with fully-reversible opening casements

Doors →

  • Solid Hardwood Main Entrance door with double glazed sidelights and fanlight
  • Solid timber fire doors in communal areas
  • Veneered solid-cored fire door sets to each flat entrance
  • Veneered flush solid-cored door sets within each flat
  • Contemporary satin finish lever handle ironmongery

Internal Fittings →

Bathrooms (except Apartments 1, 3, 13 & 19)

  • Acrylic bath with thermostatic mixer/diverter tap, shower handset
  • ‘Minerelle’ solid composite panels to splashback
  • WC with concealed cistern and dual flush
  • Wash Basin with semi-pedestal & single level mixer tap
  • Heated Towel Rails
  • Mirror & shaver socket Shower Rooms (except Apartments 1, 3, 13 & 19)
  • ‘Walk in’ shower unit with fixed glass screen
  • Remotely-controlled Thermostatic shower valve with temperature display. Shower handset with slider bar
  • ‘Minerelle’ solid composite panels full height to walls
  • WC with concealed cistern and dual flush
  • Wash Basin with semi-pedestal & single level mixer tap
  • Heated Towel Rails
  • Mirror & Shaver Socket

Bathrooms (Apartments 1, 3, 13 & 19)

  • Acrylic Bath with thermostatic mixer/diverter tap, shower handset & slider bar & Glass shower screen
  • ‘Minerelle’ solid composite panels full height to walls
  • WC with concealed cistern and dual flush
  • Wash Basin with semi-pedestal & single level mixer tap
  • Heated towel rail
  • Mirror & Shaver socket

Kitchens

  • Supplied & Installed by Kitchens International
  • Laminate doors & drawer fronts and stainless steel handles
  • Integrated oven / grill, microwave oven, 4 ring gas hob

Fridge/ Freezer, Washer / Dryer and dishwasher

  • 60mm Minerelle Solid Resin worktops with 150mm splashbacks
  • Stainless steel sink, half bowl & Drainer with single lever mixer tap in satin chrome
  • Waste disposal unit
  • Extract canopy over hob

Bedrooms

  • Built in wardrobes with sliding doors, fitted out with hanging rail & shelves

Internal Finishes →

Floors

  • Ceramic tiles over floor screed at ground floor entrance hallways
  • Heavy-duty wool mix carpet to upper floor lift lobbies & stairs
  • Corridors & bedrooms within flats have wool mix carpet
  • Lounges, dining rooms & kitchens have engineered timber

Hardwood Flooring

  • Bathrooms have heavy-duty embossed sheet vinyl

Walls

  • Plasterboard with 3-coat white emulsion paint finish

Skirtings, Facings, Trims etc

  • Painted MDF 19 x 75mm plain-edged door facings
  • Painted 16 x 145mm square-edged skirtings

Utility Services →

Gas

  • Mains Gas for central heating and cooking
  • Gas meters located within Car Park

Water

  • Communal water storage tank at Car Park Level
  • Electronically-controlled pump system to maintain constant mains pressure

Electricity

  • 230V single phase supply and single tariff domestic meter
  • Cut-outs and meters shall be located in cupboards adjacent to the apartment entrance doors
  • Consumer unit adjacent to meter

Telecommunications

  • Cable routes for British Telecom or other telecommunications providers will be provided into each apartment
  • Main BT junction box at Car Park level

ventilation →

Ventilation – All apartments except 8 & 18

  • A central fan unit extracts air from the Bathrooms & Study with outlets in the external walls (First Floor) or through the roof (Second Floor)
  • Fan unit controlled by light switches in each ventilated room with automatic run-on timer control

Ventilation – Apartments 8 & 18

  • A ‘whole house’ ventilation unit is installed to extract air from the bathrooms and studies and introduce fresh air from outside
  • Ventilation unit allows the flat to be fully ventilated without the need to open windows, including recovering heat from the exhaust air to pre-warm the inlet air, saving on heating costs
  • Fan outlets & inlets are in the external walls for Ground & First Floors and through the roof for the Second Floor
  • Fan unit controlled by light switches in each ventilated room with an additional boost & heat recovery switch located in the lounge

Kitchen Ventilation – All apartments

  • Multi-speed extract canopy above hob
  • Fan outlet in external wall (Ground & First Floors) or through roof (Second Floor)
  • All extract ductwork to be concealed above ceilings

Heating →

  • Wall mounted gas fired condensing combination boilers located within Boiler Cupboard of each flat
  • Boiler to be room sealed fan assisted
  • 7 day programmable controller for central heater
  • Concealed boiler flue
  • Wall mounted pressed steel radiators
  • Chrome-finish heated towel rail in bathrooms and en-suites
  • Thermostatic radiator valves

Hot & Cold Water →

  • Pressurised cold water from the tank/pump unit on the ground floor enters each flat in the meter cupboard
  • Hot water provided by gas fired combination boiler

Electrical →

  • All switches and sockets to be white finish

Lighting

  • Main door apartment entrance
    • External Downlighter
  • Living Area
    • Recessed Ceiling Downlighters
  • Dining Area
    • Centre pendant
  • Kitchen Area
    • Recessed Ceiling Downlighters
    • Striplights under Wall Units
  • Hallway
    • Recessed Ceiling Downlighters
  • Bedrooms
    • Recessed Ceiling Downlighters
  • Bathrooms and En-suites
    • Recessed Ceiling Downlighters
  • Terrace
    • External Downlighter

Sockets

  • Ample 13A twin mains outlets provided
  • Integrated kitchen equipment connected via a multiswitch unit with socket outlets below worktop
  • Shaver points in bathrooms and en-suites

Fire Alarms

  • Mains powered smoke alarm(s) with battery backup as required by Building Regulations.

Access Control

  • Audio entry phone system to serve all flats
  • Main call points at the stair core entrances at street level
  • Entry control handset in flat hallway

TV & Telephone

  • An Integrated Reception System (IRS) is installed to deliver Digital Satellite TV (DST), Analogue and Digital Terrestrial TV (DTT) to each flat
  • TV / Satellite outlets in the living area, kitchen area and master bedroom
  • IRS system is suitable for Sky TV or other satellite decoder to be installed by the customer
  • Telephone master socket position located in the meter cupboard, suitable for connection to BT or other provider by the owner
  • Additional telephone outlets in the master bedroom, kitchen area and living area

Lift

  • Each stair core has a platform-type passenger lift serving all floors, located in the stair hall
  • Lift car will be fully enclosed, with hinged doors at each floor level
hidden pic hidden pic hidden pic hidden pic hidden pic hidden pic hidden pic